Floor and wall covering · SIC 43330 · Brighton and Hove
KB FLOORING LTD
Subfloors made good, then vinyl, LVT, laminate, engineered wood and
carpet fitted to the measure taken in the rooms.
Before anything comes up
A floor is fitted twice: once on paper at the measure, then once on the
day. The sheet below is the paper half. It carries the rooms, the base under them, the
covering chosen and the bar at every doorway, then the van is loaded from it.
The work is domestic floor and wall covering, with small commercial units taken on the same
terms. Houses, flats, a shop floor, a treatment room, a single office. An enquiry reaches the
fitting line by e-mail with the address, the rooms and the covering under consideration, then
a measure is arranged for a time when the rooms can be cleared.
Registered office8 Stanley Avenue, Portslade, Brighton, BN41 2WJ, United Kingdom
On the registerEngland & Wales · Company No. 14096254 · D-U-N-S No. 228920270
Rooms taken onHalls, living rooms, kitchens, bathrooms, bedrooms and flights of stairs
Take a room off the plan
A flat is not one floor, it is six decisions that meet at the doorways.
Choose a room on the plan and the sheet turns to it, then it reads out the base under that
room, the covering on it and the edge that closes it.
Everything arrives here wet and gritty, then it walks the length of the flat.
Under it
The base is read for hollows at the front door, then feathered flat.
On it
A hard covering with a deep wear layer, set out to run with the walk.
At the edge
A flat bar on the front threshold, then ramp bars into the rooms either side.
Living room
Warmth and quiet lead the choice here, while the bay decides the widths.
Under it
Acoustic underlay over a level base, taken tight to the hearth.
On it
Carpet, engineered wood or LVT, laid so the boards run to the window.
At the edge
A T-bar into the hall, then scotia round the bay and the chimney breast.
Kitchen
Water and dropped weight decide it, then the plinth line decides the cut.
Under it
The base is primed and levelled, then left until it is hard and dry.
On it
Sheet vinyl or glued LVT, scribed round the plinth and the pipework.
At the edge
A flat bar under the door, then a sealant line where the covering meets the plinth.
Bathroom
The floor is cut by template here, then every seam is welded shut.
Under it
Ply overlay screwed down on close centres, then the joints are filled.
On it
Sheet vinyl, coved up the wall while that detail is wanted, then capped.
At the edge
A flat bar clamps the cut edge, then the vinyl is welded to the bar line.
Bedroom
Soft underfoot wins here, then the wardrobe run decides where a seam falls.
Under it
Underlay laid to the tack strip, butted and taped across the room.
On it
Carpet stretched onto the pins, with the pile set to lean away from the window.
At the edge
A carpet bar gripped into the base, then the edge is tucked in behind it.
Stairs
Each tread and riser is measured on its own, then the flight is cut in order.
Under it
Tack strip in the angle of every step, then underlay cut tread by tread.
On it
Carpet pulled tight over each nosing, then knee-kicked into the back angle.
At the edge
A landing bar at the top, then the covering runs on into the hall.
The plan is a drawing, not the flat. The measure records the real widths,
the real thresholds and the real order the rooms are fitted in.
Five coverings off the van
The rail holds what comes off the van. Take one and the page turns to
that material, then its line in the schedule below lifts to the front. The planks laid in
behind the rail are set out in herringbone, the pattern that eats the most offcuts.
What each covering asks for, on the floor and at the door.
Covering
Underlay and base
At the doorway
Wear surface
Sheet vinyl
Goes onto a smooth dry base, then bonds down or loose-lays with a taped perimeter.
Scribed into the reveal, then a flat bar sits over the joint.
A clear wear layer over the printed film; its thickness is on the label.
LVT plank
Glued to the base, or clicked over a thin acoustic mat where the click system allows it.
Planks stop short of the frame, then a low bar covers the run.
A wear layer quoted in microns, read off the pack at the measure.
Laminate
Floats over foam or fibreboard underlay, loose of the base throughout.
An expansion gap is left, then a T-bar bridges into the next room.
A melamine face; the abrasion class is printed on the pack.
Engineered wood
Floated over acoustic underlay, or bonded to the base where the room takes traffic.
A gap is left at every fixed edge, then scotia or a bar closes it.
A solid top layer; its depth sets how often the floor sands.
Carpet
Tack strip round the room first, then underlay, then the carpet is stretched on.
Gripped both sides, then a carpet bar clamps the cut edge down.
Pile that flattens under traffic, then lifts again with a rake.
Each covering is taken further on the covering
page, read property by property rather than name by name.
Measure, allowance, packs
Rooms go in as length by width in metres. The sheet adds each room up, applies the waste
allowance carried by the covering, then divides by the coverage printed on the pack and rounds
up to the next whole pack. Every figure it uses is shown, so the sum follows by hand.
Guide only
Nothing is cut until the room has been measured on site.
Starts on a round figure; overwrite it with the number on the label.
Room
Rooms measured
1
Floor area, added up
14.00 m2
Waste allowance at 7%
0.98 m2
Area to order
14.98 m2
Whole packs or rolls, rounded up
2
The sheet totals rectangles and rounds up, and that is the whole of it.
It reads no bay, no chimney breast, no threshold and no pattern repeat, and it settles no
price. An order goes out on the measured drawing taken in the rooms.
The allowances built into the sheet above, printed in full.
Covering or layout
Waste allowance
Where the allowance goes
Sheet vinyl
7%
Cut from a roll width, then scribed at both ends.
LVT plank
8%
Cuts at each wall, plus offcuts too short to start a row.
Laminate
8%
Row starts are staggered, so board ends drop out.
Engineered wood
10%
Boards are graded and sorted while they are laid.
Herringbone layout
15%
Every perimeter cut lands on the diagonal.
Carpet
10%
Roll width governs, then pile direction fixes which way it turns.
One room, six allowances
The same floor area is ordered six ways, because the covering and the layout decide how
much of it ends up in the offcut bag. One area goes in, one pack coverage goes in, then the
whole lookup table runs on both figures at once. The last column counts the packs each line
costs over the leanest line in the table.
Guide only
One room, or the rooms above added together.
One coverage runs down the table, so the lines compare like for like.
Reading 18.00 m2 of floor against
2.50 m2 a pack:
The allowance table, run out in full against the area above.
Covering or layout
Allowance
Allowance, m2
Area to order, m2
Packs
Over the leanest line
Sheet vinyl
7%
1.26
19.26
8
level
LVT plank
8%
1.44
19.44
8
level
Laminate
8%
1.44
19.44
8
level
Engineered wood
10%
1.80
19.80
8
level
Herringbone layout
15%
2.70
20.70
9
+1
Carpet
10%
1.80
19.80
8
level
Allowance is area times the percentage on its own line. Area to order is
the two added. Packs are that figure divided by the coverage, then rounded up. A real order
uses the coverage printed on each label, so the pack column moves once the label is read.
The floor rises by the build-up
The question that arrives before any other one: will the door still shut?
A new floor is not laid at the old height. It sits on top of the base, so the underlay and the
covering added together are exactly how far the finished floor comes up.
Measure the gap under the closed door with a rule, then add the two build-up figures off
the packs. What is left is the clearance the leaf has once the floor is down. When that runs
short the leaf comes off at the measure, then the bottom is eased and rehung the same day.
Guide only
Foam, fibreboard, acoustic mat or ply: the figure on the roll.
Board or sheet thickness, wear layer included, off the pack.
Measured at the leading edge, on the old floor, before anything comes up.
The floor comes up by
13.0 mm
Clearance left under the leaf
-1.0 mm
The leaf comes off at the measure, then the bottom is eased.
Underlay plus covering is the rise. The clearance is
whatever the leaf has left over the finished floor, at its leading edge.
Thresholds, bars and the gap at every fixed edge are set out on
the edges page.
The day the van arrives
A fitting day runs in a fixed order, and the order is what keeps a room
usable by the evening.
1
The room is cleared and the old covering comes up
Furniture goes out or moves to one half, then the old covering is lifted and bagged.
Old tack strip, staples and adhesive ridges come off the base with it.
2
The base is read, then made good
The base is swept and checked with a straight edge. Hollows are filled, high spots are
taken back, then the floor is left until the repair is hard.
3
Doors are eased where the build-up needs it
Any leaf that will catch comes off its hinges first, while the room is still empty.
The bottom is taken down by the build-up, then the leaf is rehung and tried.
4
Underlay, tack strip and the perimeter go down
Tack strip is fixed round the room where carpet follows, then underlay is laid, butted
and taped. A floating floor gets its perimeter gap set out at this point.
5
The covering is set out, cut and laid
The run is dry-laid first, until the cut at each wall balances and the seams fall away
from the traffic. Then it is fixed for good, cut by cut, from the longest wall.
6
Edges are closed and the room goes back
Bars are fixed into the base, scotia is pinned and the perimeter is finished. Offcuts
are bagged, the floor is cleaned down, then the furniture comes back onto pads.
The first month underfoot
A floated floor settles while the room takes it up and down in temperature, so heavy
furniture goes back gently and stands on felt pads. Glued goods are left alone until the
adhesive has taken, then normal traffic starts. A new carpet sheds loose fibre for a while,
then it stops; a light vacuum, taken often, carries it away.
Grit is what wears a floor out, so a mat at every outside door earns its keep. Hard
coverings are damp-mopped, and wood is kept clear of the wet mop. Anything laid over
underfloor heating is brought up to temperature a step at a time, until it reaches its
working heat.
What the sheet leaves behind
The measured drawing, the covering fitted and the batch details are written up on the job
sheet, then the customer takes a copy of that record home on the day. Offcuts long enough to
patch are left with the customer, labelled with the room they came out of. What the sheet
holds and how long it is kept are set out on
the details page.
Where the work goes
The run of work sits inside Brighton and Hove: Portslade, Hove, Southwick, Hangleton,
Kemptown and Rottingdean. Where a base needs levelling before a covering will sit flat, that
is surveyed on its own and quoted on its own line, then it is set out on
the base page. Enquiries reach the fitting line at
fitting@kbflooring.shop.